Rev Description By Date
DRAWING STATUS: PRELIMINARY - subject to building control approval
First issue. swf 28.12.10
Client
Project
Job
RevisionDrawing No.Project No./Dicipline
Drawn
CheckedDate
Scale
Drawing Title
General Arrangements
Ground Floor
1019- 001 P8
1:50
28.12.10
SWF
AA
Mrs J Briton
Long Lane, Gamblingay.
New Build Bungalow
Working Drawings
P1
R
Osborn House, 20 High Street South, Olney, Bucks. MK46 4AA.
Doors & Windows Notes
All windows to have trickle vents achieving 8000mm
2
min.background ventilation.
All windows to bathrooms and WC's to have trickle vents
achieving 5000mm
2
min. background ventilation and
mechanical rapid ventilation.
Windows to be 'Low E' white uPVC double glazed with 16mm
gap and filled with Argon gas to achieve a min. value of
1.6W/m
2
K.
Areas requiring toughened glass to BS6202.
Internal doors to bathrooms and WC's to have 10mm gap at
bottom.
General Notes
Do not scale off this drawing unless a scale
bar is provided.
Any ambiguities, omissions and errors on this
drawing should be notified immediately to the
Architect before the commencement of works
on site.
All dimensions are in millimetres unless
otherwise stated.
All dimensions, unless otherwise indicated,
are to the face of unfinished block walls or to
the rough timber face of stud partitions.
All dimensions are to be checked on site. Any
discrepancies are to be notified immediately
to the Architect before the commencement of
works on site.
All levels are in meters unless otherwise
stated.
This drawing is to be read in conjunction with
all other relevant drawings and specifications
for this project.
CDM Regulations
Denotes a significant Hazard or
difficult to manage procedure. Please
refer to Designer Hazard Register for
further information regarding
mitigation of hazards
Setting Out Notes:
Setting out drawings to be read in
conjunction
with other relevant design drawings.
Grid dimensions set out to the follow:
- the outside face of external wall
brick/blockwork.
Unless otherwise indicated on drawing.
All internal dimensions are to face of timber
stud/blockwork.
Final location of rwp's to be determined
subject to
rainwater calculation.
Locations of movement joints (MJ) subject to
confirmation by structural engineer. Note
blockwork may
require additional bed joint re-inforcement,
final
specification and centres to be advised by
structural
engineer.
CDM AWARE!
Steelwork.
CDM AWARE!
Ground floor construction.
Falling objects from above.
CDM AWARE!
Steelwork.
Proposed steelwork added. Doors
and windows schedule added.
Dimensions and notes added.
Some internal walls changed to
load bearing. Cavity nibs removed.
swf 12.01.11P2
Structural engineering up-dated
following further design checks.
Minor internal layout changes
made in accordance with client
comments.
swf
21.09.11P3
Structural openings for doors D009,
D010, D011 & D012 decreased as
shown. Steel columns removed on
both gables. Steel schedule
up-dated and note added. Glazed
roof area and steel beam
removed. All to clients instruction.
swf 23.11.11P4
Steels
All steels, either to be supplies as-is or to be fabricated,
MUST be checked against as-built measurements on site
before order and/or fabrication. Any discrepancies to be
reported immediately.
Internal doors D004 & D005
increased in size. Notes added and
dimension added to front entrance
door. Post B9 and beam B22
moved. Lintels and padstone
details added.
swf 05.12.11
P5
Piers increased in size. swf
08.12.11P6
Windows u-value changed. swf
16.12.11
P7
Structural connection detail and
beam calculation references
added. Missing Steels added to
schedule.
swf 21.12.11P8